Generating FirmGenerating Station (FY 2020-2021)Plant Capacity (MW)Licensee's Share
(in %)
Licensee's Share
in MW
NEEPCO
Kopili HEP200.0004.6189.240
Kopili - II SHP25.0006.0401.510
Khandong HEP50.0003.9401.970
Ranganadi HEP405.0005.70023.090
Doyang HEP75.0005.2503.940
Pare HEP110.0005.7656.340
Tuirial HEP60.000100.00060.000
AGBPP291.0005.41015.740
AGTPP130.0006.0007.800
NEEPCO - TOTAL1346.000
129.630
TSECL
Baramura - IV21.00025.0005.250
Baramura - V21.00025.0005.250
TSECL-Total42.000
10.500
OTPC
Palatana726.0003.03022.000
OTPC-Total726.000
22.000
NHPC
Loktak HEP105.0005.0205.270
NHPC-Total105.000
5.270
NTPC
Bongaigaon TPS750.0005.41540.610
Farakka TPS1600.0000.1402.240
Kahalgaon STPS840.0000.1401.180
Talcher STPS1000.0000.1401.400
NTPC-Total4190.000
45.430
IEX
Power trading throuh IEX/PXIL
Sale/Buy is undertaken on need basis
STATE
Owned Generating Stations29.35029.35029.350
GRAND TOTAL
6438.350242.180242.180